I'm with WTTCMN and I don't go with the %. But I DID break it down:
- 3.2% through builder (electrical, many ethernet upgrades, ceiling fan prewire, extra canned lights, upgraded air filter, caesarstone throughout, upgraded tile flooring in all 3 bathrooms)
- 4.2% outside contractors...